Real Estate & Construction

Innovative technology as a global standard for Blue Projects - Building information Modelling (BIM)

By Michał Zając, BIM manager /senior architect at Blue Projects
Header micha  zaj c

 

Building Information Modelling (BIM), a technology we use in the design process in Blue Projects, was introduced into the global world of construction over 10 years ago.

BIM is the next step digitalising the construction process, bringing with it an innovativeness that induces changes in the way of thinking during the design process. The examples of its application all over the world can be easily found on the internet, Heathrow Airport’s third-runway expansion project being among the most prominent ones.

BIM can be defined briefly as a process which allows us to create a virtual data base represented in a 3D model.

It is a computer simulation of the construction process conducted in the virtual environment, enabling us to view the building aspects, including the associated infrastructure, before construction has actually started on site.

While some call BIM a revolution, in Blue Projects we prefer to view it as the evolution. The next step after the drawing board, CAD drawings and traditional schedules and cost estimates.

BIM offers a much wider functionality compared with conventional design techniques.

Why do we use BIM technology in Blue Projects?

We have chosen it to offer our clients the benefits of BIM which are of particular relevance when dealing with big and technologically complex facilities. Founded in 2007, the company has grown globally and delivered hundreds of projects from manufacturing facilities to real estate and commercial developments in over 22 countries including Poland, the UK, Romania, Belgium, Netherlands, Russia or Germany. Our core services include project management, construction management, design & engineering, commercial management, and health & safety management.

Using innovative solutions allows us to continually improve the quality of our services.

The most important benefit to the design process is the efficient exchange of information via a parametrised 3D model.

In conventional CAD techniques, designers deal with a set of lines which make up flat 2D drawings, or simple 3D shapes. But in BIM, the designer uses objects, such as doors, walls, floor slabs and foundations, whose physical properties are determined by the input parameters.

Working with 3D models that are parametrised in this way, we can effectively conduct the process of inter-disciplinary co-ordination. This enables us to eliminate problems that could otherwise emerge on site. Such problems – such as when pipework clashes with wiring or pillars – give rise to additional, often massive, unforeseen costs.

The output documentation, necessary for the process of gaining planning permissions, results from work on the parametrised model.

Using this technology and the 3D environment helps the client understand all the key aspects of the design; in this way the client becomes actively and effectively involved in the design process.

When used in combination with virtual reality (VR) technology BIM models enable the client to visualise the project from the earliest stage of design.

At the construction stage in turn, BIM technology enables the entire project documentation to be compiled in one place. In this way, having the as-built database stored in a 3D model containing all the information representing the actual situation, we avoid data fragmentation, which is all too easy with paper documents scattered across individual files and folders.

Easy retrieval of this information is of essence when it becomes necessary to introduce changes during the premise’s operation.

These are just a few benefits offered by BIM. Just like with any other sophisticated technology, appropriate level of standardisation and implementation of processes to guide the actions of BIM users are indispensable to make the most of its capabilities.

In projects with BIM, we apply US and UK practices and standards. At the same time, we always work according to our client’s standards and requirements.

Over the years, BIM is becoming a more and more popular tool used in delivering construction projects. What makes us stand out next to our competitors using BIM technology?

Blue Projects is distinguished by combining the work of construction engineers of different design disciplines with the work of process engineers within a single project team.

In our design work we place focus on interoperability. Interoperability means, to put is as simply as possible, using BIM models to combine various data exchange formats.

In our efforts we are assisted by sophisticated design tools which, when used by trained personnel, ensure obtaining effective solutions.

This allows us to claim our position as a leader among design engineering companies using innovative technologies in the design process.

One of our key projects is the design of expansion of a manufacturing site located in central Poland. In this case BIM technology was used in the design process and will continue to be used during construction.  

One large completed project in Romania is that for a renowned furniture retailer, covering 67,000m2, including a furniture department store, a commercial building including auxiliary logistics, storage, restaurant, offices and technical areas.

At Blue Projects we say that difficult paths often lead to marvellous destinations. Using BIM technology in our day-to-day work is one of such difficult paths. One could ask why it is so important for us to follow this avenue.

The answer is, there is no other way! Technological progress allows for, and indeed necessitates continuous adaptation to changing conditions. And we are committed to continuous development!

About the author:

BIM manager at Blue Projects. IARP architect, graduate of the Faculty of Civil Engineering and Architecture West Pomeranian University of Technology. BIM technology practitioner and enthusiast.

Consultant and trainer at the European BIM Certification Center Foundation.

Experience gained while working on complex  industrial objects, public buildings and reverse engineering projects.

Has been working exclusively with BIM technology for over 12 years. Responsible for coordination,creating standards and procedures as well as a training system and BIM team management

For more information about us please visit our website:

https://blueprojects.com/

Information on BIM technology can be found at the following sites:

https://bimforum.org
https://www.buildingsmart.org/
https://bim-level2.org/
https://eccbim.org/

More in Real Estate & Construction:

How productive is commuting?

By IWG, the world’s largest provider of workspaces like Regus and Spaces on the Polish market

 

The average urban commute in Poland is 41 minutes. The average Pole spends 340 hours a year just getting to work and back home. Employees are increasingly spending their commute engaged in work – but how effective that time is.

How architects add value

By Martin Hyams, director, AHR

 

The value of a building is often difficult to assess or quantify, with ‘value’ dependent on the perspective of the individual.

Destination: Poland. How to transform your next office choice into a flagship project that defines your business and its aspirations.

By Wojciech Zebura, director, head of Warsaw, Nuvalu

 

If planned well and with enough forethought, relocating or expanding your business to Poland could not only accelerate your growth but redefine how you are perceived in your home markets by your customers, employees and other key stakeholders.

Location worth its weight in gold

By Bartosz Michalski, development director, SEGRO

 

Proximity to major transportation routes, a location near an urban agglomeration and access to staff – these are the main features distinguishing the best warehouse locations.